The estimated factory build time for the ASAP House is two weeks arriving at the site 80% finished in the form of three prefabricated modules. The house is designed to set on a concrete foundation, typical of New England, with only final assembly and finish work left for on site. The full basement uses prefabricated walls, is insulated and can be finished at a later date.